Cartridge Filter, Dust-Liquid-Separator, Heat-Exchanger, Waterbath-Heater, Cellular Gas Filter, Knock-Out-Drums, Start-Up Strainer, and more...
mehrWe are specialized in extraordinary, international Design-Codes and highest technical requirements:
Engineering and Design according to:
Design-Codes: AD2000, ASME, PD5500 (British Standard), EN13445, AS1210, Stoomwezen, more on demand.
Tests and Options: TÜV, CE, PED97/23/EG, DVGW, DGRL, Lloyd's Register,NACE, ERI, GOST, U-Stamp, MOM
Here you will find our reference list according to each product group. All vessels have been engineered by GTS-Thielmann and manufactured in our qualified workshops of our long term based manufacturers.
It's a pleasure for us to be your professional and competent, international business partner for engineering and design of pressure vessels with highest technical requirements.
We are specialized in engineering and design of high pressure and low temperature applications, and extraordinary design-codes.
For detailed product information, please see 'Products'.
GTS Thielmann Energietechnik GmbH is certified by many well-known institutes. Please find here our products' certificates and our DIN ISO9001 certificate.
mehr
Successful Commisioning (September 6th) of GAS-In-Unit‘ delivered by company Uhde - equipped with two GTS-Thielmann Energietechnik Waterbath-Heatern completed.
The NordStream Pipeline will be the major gas supplying unit for Europe. The first of the Nord Stream’s twin 1,224 km gas pipeline through the Baltic-Sea has been successfully filled. The pipeline starts in Vyborg (Russia) and ends in Lubmin near Greifswald (Germany). The ‚Gas-In‘ of the second twin has been determined for late 2012. On September 9th the Russian Governor Mr. Putin formally started-up the ‚Gas-In-Process‘. The former German chancellor and chairman of the Nord Stream AG, Mr. Gerhard Schröder has inspected our waterbath-heaters at the first commissioning.
GTS-Thielmann Energietechnik GmbH delivered two heaters – 4MW capacity - to company Uhde GmbH (Bad Soden) after 5 months. Short delivery time and high requirements, e.g. 220 bar design, have been successfully fulfilled by GTS. Each heater has a net weight of approx. 35 tons.
Each heater had been installed on a skid. The complete skids were scope of supply by Uhde GmbH. The skid units are also known as ‚Gas-In-Unit‘. The application of the heater-units is to heat up the natural at the ‘Gas-In-Process’ of the pipeline. The first Gas-In process is creating a temperature drop of the gas caused by the pressure reduction (Joule-Thomson-Effect). The heat-up-process of the gas is necessary to reach the pipeline operating pressure.
Contact us
THIELMANN ENERGIETECHNIK GmbH