IndustryProject / LocationCountryCustomerYear
PowerRiyadh (SA)Saudi ArabiaBilfinger Rotring2010

The heavy oil-fired power plant in Riyadh, Saudi Arabia, is designed for 2600 MW. In 2010, this power plant will be expanded with gas turbines, creating an additional 700 MW of capacity. By 2015, the power plant will be expanded to a total capacity of 4,600 MW, making it one of the largest combined cycle power plants in the world.

Technical Data:
ProductDust-Liquid Separator (Inletfilter)
TypeVSFA-V-PC 26.1250.70.450.1
Quantity3 pc(s)
CodeASME + U-Stamp
P design70 bar
T design-10 bis 85°C
Flow rate VN210.100 Nm³/h
Efficiency99,9 % > 1 μm
Weight9 tons
Specialsincl. ACID-Cleaning, c2=5mm
Technical Data:
ProductCyclone Separator (Scrubber)
TypeVZA 1000.70.450.a
Quantity3 pc(s)
CodeASME + U-Stamp
P design70 bar
T design-10 bis 85°C
Flow rate VN210.100 Nm³/h
Efficiency99,5 % > 10 μm
Weight4,8 tons
Specialsincl. ACID-Cleaning, c2=5mm
Technical Data:
ProductCondensate Tank
TypeVKAB 1600.3,5.8500
Quantity1 pc(s)
Volume8.500 liter