IndustryProject / LocationCountryCustomerYear
Power PlantAz Zour North+ Sabiya (KUW)KuwaitSiemens / Bilfinger Rotring2016

April 2016

The 1,500MW Az-Zour North gas-fired combined cycle power plant is located in Az-Zour, approximately 100km south of Kuwait City. The power plant was built as part of the Az-Zour North Independent Water and Power Project (IWPP). The construction of the power plant and a desalination plant forms the first phase of the IWPP. The new integrated power plant and desalination plant was completed and commissioned in the fourth quarter of 2016.

Technical Data:Az Zour North+
Sabiya
ProductCyclone-Separator
TypeVZA 1100.40.500.a
Quantity4 pcs
CodeASME // NACE
P design40 bar
T design-10 / + 60 °C
Flow rate VN156.250 Nm³/h
Efficiency99,5 % > 10µm
Weight5 tons
Technical Data:Az Zour North+
Sabiya
ProductInletfilter
TypeVSFA-H-PC 33.1500.40.500.3
Quantity4 pcs
CodeASME // NACE
P design40 bar
T design-10 / + 60 °C
Flow rate VN156.250 Nm³/h
Efficiency99,9 % > 1µm
Weight15 tons
SpecialsKemlock Segment-Closure
Technical Data:Az Zour North+
Sabiya
ProductFinalfilter
TypeVSFA-V-PZ 8.750.62.250.1
Quantity4 pcs
CodeASME // NACE
P design63 bar
T design-10 / + 100 °C
Flow rate VN78.125 Nm³/h
Efficiency99,5 % > 0,5µm
Weight2,5 tons