IndustryProject / LocationCountryCustomerYear
Power PlantBandar Abbas (IR)IranSiemens / EEE2016

October 2016

In the course of the delivery of the F-class gas turbine from Siemens to the MAPNA Group in Iran, the company Thielmann Energietechnik GmbH delivers 4 final filters to the plant manufacturer.
The final filter skid, which is completely assembled by the plant manufacturer, is used to treat the gas for operation of the turbine.

The Bandar Abbas power plant in Iran will have an electrical output of around 600 MW and will supply around 150,000 households.

Technical Data:
ProductDust-Liquid-Separator (Finalfilter)
TypeVSFA-V-PZ 3.700.47.250.1
Quantity4 pcs
CodeASME
P design47 bar
T design-10 to 80°C
Flow rate VN85.850 Nm³/h
Efficiency99,8 % > 2µm
Weight2,2 tons
Specials